Printable Version
1. Introduction
2. Revised Guidelines
3. Flood Management Works undertaken with Central Assistance in Uttar Pradesh
Annexures :
a. Sanction Order issued by the Ministry of Water Resources constituting the Empowered Committee
b. Minutes of Meetings of the Empowered
c. State-wise break-up of on-going works approved by EC-FM in its six meetings
d. State-wise details of area to be protected and population to be
e. State-wise details of funds released for on-going works approved in XI plan as on 15th November’2010
f. State-wise details of physical achievements and outcome as the area protected and population benefited upto 31st July’2010